How long does a website project take?

2 min read · November 2026

Most of our website projects take one to three weeks from kickoff to launch, as long as the changes stay small. What stretches a project is almost never the build itself. It is how long decisions, feedback and content take to arrive.

What happens during those weeks?

Every project follows the same shape. It starts with an onboarding and discovery meeting. We then research, and for most sites we design in Figma with rounds of iterations before anything is built. The build follows, in Webflow or Wix, and then the launch. Some projects skip a step: G Forward Impex's site was built directly on Wix with no separate design phase, so the process was shorter.

What can make a project take longer?

Three things stretch a timeline most: feedback that takes days instead of hours, content such as text and photos that is not ready when the build needs it, and changes to the scope after the design is agreed. None of them is a problem, but each moves the launch date, which is why we say the range holds when changes stay small.

What do we need from you to stay on schedule?

Three things: timely responses when we ask you something, decisions that stay decided once they are made, and the content and feedback we need when we need them. Tell us early if any of that is not possible and we will plan around it.

Does the timeline change with the kind of project?

A website built straight onto Wix, a design-led site built in Webflow and a migration all take different amounts of work inside the same range. If your project is bigger than the range, we say so in the first meeting rather than after we start.

What does it cost?

We do not publish fixed prices, because the scope decides the price. After the discovery meeting we agree the scope, the timeline and the price with you in conversation.